kew2006's Kitchen
Kitchen finished just in time - Baby girl due in two weeks!
Contact: kew2006 (My Page)
Posted on Wed, Aug 9, 06
Link to kitchen photos: http://www.kodakgallery.com/I.jsp?c=ysff3zn.8w861q93&x=0&y=fco04y
Details:
- Cabinets: Medallian St. Andrews, Cherry Pecan finish
- Counters: Santa Rita Soapstone from M. Teixteira (soapstones.com)
- Range: Kenmore Elite Dual Fuel Slide-in
- Dishwasher: Kenmore
- OTR Microwave: Kenmore Elite with Advantium
- Refrigerator: Kenmore Elite Trio, counter depth
- Sink: Whitehaus
- Faucet: Pegasus Bridge – this is already leaking, don’t know if it is the faucet or installation
- Floor Tile: Emil Ceramica Waterfalls Green Iguassu
- Backsplash and Bathroom Tile: Intesa Porcellana, 5x5 field
- UC Lighting: Kichler UC Lights
- Kitchen Curtains: Pottery Barn
- Bathroom Curtains: countrycurtains.com
- Kitchen Paint: BM Hawthorne Yellow
- Powder Room Paint: BM Danville Tan
- Table and Chairs: Room and Board, but we are returning the table to get a smaller and lighter colored table.
We did a complete gut remodel of the kitchen and adjacent powder room, adding insulation, new electric, new plumbing, hydronic radiant floor heating which required a new boiler that we needed anyway, new drywall; basically, the works. We enlarged the window above the sink and moved the doorway to the hall that leads to the powder room and to the stairs down to our basement family room.
The original powder room was only 42"x48" and contained a toilet, sink, and radiator. We enlarged the bathroom to 7’x42" and turned the toilet to allow a more useful design. We were also able to remove the radiators freeing up more space.
Total project took 9 weeks with no major problems. There are some things I may have done differently, but overall I’m very pleased with the outcome.
0 comments:
Post a Comment